The job
A commercial yard needed a new reinforced concrete slab, placed in sections while the rest of the property kept working around it.
The work
The base was compacted with a double-drum roller, then a full rebar grid was laid out and tied by hand and held up off the base ahead of the pour. Concrete was placed straight from the ready-mix chute, vibrated around the steel and raked out to the forms.
The finish
The crew struck it level with a screed, closed the surface with bull floats, worked the edges with hand tools and brought up the final finish with a power trowel.
Services on this job
Serving this job area from San Antonio, Texas.
Status shown is completed. Client names, addresses and specific figures are left out on purpose.











