The problem
The railroad tie retaining walls along the drives of a multifamily community were failing, with ties rotted through and the area taped off from residents.
The work
A mini excavator pulled the old walls apart and dug the soil back behind the wall line. Replacement ties came in by grapple truck and were cut to length on site with chainsaws. The excavator helped set the heavy ties, and the crew checked the wall with a straight board as it went up, course by course.
Drainage
Drain pipes were set through the wall, wrapped and bedded in drain rock so water has a way out from behind it.
The result
A track loader moved backfill along the wall and cleaned up the grade at the base, leaving new tie walls holding the grade along the drives and walkways.
Services on this job
Serving this job area from San Antonio, Texas.
Status shown is completed. Client names, addresses and specific figures are left out on purpose.














