The job
New underground pipe had to go in alongside a commercial building while the rest of the site stayed active around it.
The work
The crew fenced off the work area and opened the trench with an excavator, cleaning it up by hand along the marked line. Pipe sections were laid out above ground and joined under a shade tent before going in. Twin runs were then set in the trench, with a safety ladder in place for the crew working below grade. Clean sand was brought in and placed in the trench around the pipe.
Services on this job
Serving this job area from San Antonio, Texas.
Status shown is completed. Client names, addresses and specific figures are left out on purpose.